Base Charges
Inside City Limits:
3⁄4” meter $5.00
1″ meter $8.50
1 1⁄2” meter $20.50
2″ meter $32.75
3″ meter $75.00
4″ meter $127.50
6″ meter $268.00
8″ meter $482.50
10″ meter $723.50
Outside City Limits:
3⁄4” meter $6.25
1″ meter $10.50
1 1⁄2” meter $25.00
2″ meter $39.50
3″ meter $90.75
4″ meter $156.25
6″ meter $333.25
8″ meter $583.25
10″ meter $875.00
Usage Charges $/Ccf Inside City Limits $3.50 Outside City Limits $3.85
Water Commercial and Industrial from Fire Hydrant Meters: $0.75 per hundred gallons
Inside City Limits:
3⁄4” meter $5.40
1″ meter $9.25
1 1⁄2” meter $22.00
2″ meter $35.55
3″ meter $81.00
4″ meter $137.75
6″ meter $298.50
8″ meter $521.00
10″ meter $781.50
Outside City Limits:
3⁄4” meter $6.75
1″ meter $11.25
1 1⁄2” meter $27.00
2″ meter $42.75
3″ meter $97.75
4″ meter $168.75
6″ meter $360.00
8″ meter $630.00
10″ meter $945.00
Base Charges
Minimum base charge inside of the city limits is $5.40 Minimum base charge outside of the city limits is $6.75
Usage Charges $/Ccf Inside City Limits $3.45 Outside City Limits $3.80
Apartment complexes inside of the city limits minimum base charge $5.40 per unit. Apartment complexes outside of the city limits minimum base charge $6.75 per unit. A Madison County Wastewater Authority (MCWA) usage charge will be assessed to all customers whose sewer enters the MCWA system. The charge will offset all MCWA related cost. The current MCWA rate is $3.57 per CCF
gas rates
canton municipal utilities
board metting 08/04/2009
COMMERCIAL GAS (INSIDE)
Fixed Charge | $12.00 |
1st 500 ccf | .30 ccf |
Next 9,999,999 ccf | .28 ccf |
COMMERCIAL GAS (OUTSIDE)
Fixed Charge | $14.00 |
1st 500 ccf | .39 ccf |
Next 9,999,999 ccf | .37 ccf |
RESIDENTIAL GAS (INSIDE)
Fixed Charge | $7.00 |
1st 200 ccf | .30 ccf |
Next 9,999,999 ccf | .28 ccf |
RESIDENTIAL GAS (OUTSIDE)
Fixed Charge | $8.00 |
1st 200 ccf | .39 ccf |
Next 9,999,999 ccf | .37 ccf |
INDUSTRAIL GAS (INSIDE)
Fixed Charge | $30.00 |
1st 1,000 ccf | .30 ccf |
Next 5,000 ccf | .28 ccf |
Next 10,000 ccf | .26 ccf |
Next 9,999,999 ccf | .25 ccf |
LARGE VOLUME INDUSTRAIL (20,000 ccf per month usage)
Fixed Charge | $180.00 |
1st 20,000 ccf | .30 ccf |
Next 100,000 ccf | .28 ccf |
Next 500,000 ccf | .26 ccf |
Next 9,999,999 ccf | .22 ccf |
The rate reflects a base cost of fuel at $.60 per ccf.
DEPOSITS
April 1, 2008
Homeowner | Raise from $75.00 | ALL ELECTRIC $200.00 |
---|---|---|
$75.00-Electric | ||
$75.00-Gas | ||
$25.00-Water | ||
$25.00-Sewer |
Rental | Raise from $185.00 to $300.00 | ALL ELECTRIC $300.00 |
---|---|---|
$125.00-Electric | ||
$125.00-Gas | ||
$25.00-Water | ||
$25.00-Sewer |
Rental Trailer Park | Raise from $250.00 to $375.00 | ALL ELECTRIC $375.00 |
---|---|---|
$150.00-Electric | ||
$150.00-Gas | ||
$75.00-Water and Sewer |
Rental Apartment | $75.00-Water and Sewer | |
Water Only | $50.00-Water and Sewer | |
Commercial | Double the highest bill rounded up. | |
Temporary service | Raise from $35.00 to $75.00 |
All new connections will be charged a deposit.